Recovery of the Vallonga Bridge and its surroundings

Recovery of the Vallonga Bridge and its surroundings

In het kort:

Land
Spanje
Soort werk
Constructie, Natuur
Projectduur
17 t/m 31 juli
Aantal deelnemers
15 (7 mannen en 8 vrouwen)

Lees snel verder voor meer informatie over de werkzaamheden, de accommodatie, de projectlocatie en de kosten. Heb je een vraag over dit project? Laat je gegevens achter bij "Stel een vraag" en we nemen zo snel mogelijk contact met je op.

Werk

Repair of the ancient path which connected two towns, "La Seu d’Urgell" and "Sant Llorenç de Morunys". Task focuses on the stretch from "Sant Llorenç" to "Càmping Morunys" and the arrangement of "Pont de Vallonga"’s route. The old road is a bridle path built with dry stone walls and paved with stone slabs in some stretch. Tasks: - To clean and to remove vegetation in the middle of the path, besides, arrangement of two sources of water. The started and final part of this stretch to connect with a green way goes over the Romanic bridge Vallonga where people can enjoy the service area. - To clean vegetation, to arrange the margins around the bridge and to build a raft of water retention of the stream which passes under the bridge to keep the environment clean and for the use of the native fauna according to the project carried out by the municipal technician.

Accommodatie en maaltijden

Participants are going to sleep in the City Council's Sports Centre. All participants will sleep together in one big room, and the bathrooms will be in the changing rooms of the Municipal gymnasium, adjacent to the multipurpose room. In this equipment there are toilets and showers. Each participant should bring a sleeping bag and an air mattress. The toilets and shower will be indoor or outdoor, separated for boys and girls, with hot and cold water- - WiFi available - Heating: we recommend wearing a coat or anorak All meals are going to be in the school's canteen of Sant Llorenç de Morunys. Participants, divided by groups and leaded for leaders are going to prepare the meals. If someone is vegetarian or have some allergies is important to notify on the application form.

Locatie en vrije tijd

Sant Llorenç de Morunys is a municipality of "Solsonès" region, it is a medieval place rich in history that offers a lot of leisure activities, in fact the participants will take part in the following activities: - A day trip around Solsonès and Solsona. - Visits to cultural associations of the village like the cultural association and interpretation "Centre Vall de Lord" or the Museum of Sant Llorenç de Morunys. - Activities with local people. - Discover the region by excursions and different activities lead by local associations to live the local culture. - Free time in the village's swimming pool and lake.

Organisatie

The organization in charge of the workcamp is called CRUC, namely Coordinació Rural de Catalunya, which is a non-profit, educationally and with a social action organization that is engaged in developing projects and initiatives in the rural areas of Catalonia. In addition to this, it also works within European and international projects and it can count with several agreements with the "Generalitat de Catalunya" in order to achieve its goals.

Projectnaam

Recovery of the Vallonga Bridge and its surroundings

Projectcode

CAT04

Land

Soort werk

,

Startdatum

17-7-2022

Einddatum

31-7-2022

Aantal vrijwilligers

15 (7 mannen en 8 vrouwen)

Leeftijd

18 t/m 29 jaar

Taal

Het inschrijfgeld voor dit project bedraagt € 295, exclusief € 50 studentenkorting.

Deel dit project